HI-DRONIC / SAFE OPERATIONS

Plan the job before the aircraft leaves the ground.

A practical compliance framework for commercial drone cleaning across Europe—and a clear distinction between aircraft, robots and ground tools.

EU 2019/947

Why cleaning missions normally enter the specific category

The EU open category does not allow the unmanned aircraft to drop material in flight. A cleaning mission that projects water or product therefore normally requires a specific-category route, even when the flight remains close to a façade. The final route depends on the exact operation and risk assessment.

C5 / C6 / SORA

Three compliant routes—not one universal permit

01

STS-01 / C5

VLOS over a controlled ground area in a populated environment. Maximum operating height 120 m within the scenario. Requires a genuinely C5-marked UAS, operator declaration, operations manual, trained remote pilot, direct remote identification and every STS mitigation.

02

STS-02 / C6

BVLOS over a controlled ground area in a sparsely populated environment, with the required airspace observers and scenario limits. Requires a genuinely C6-marked UAS, operator declaration, training, DRI and the full STS-02 procedure.

03

Operational authorisation

If the mission does not fit an STS, the operator applies through a PDRA where applicable or a SORA-based assessment. The competent authority approves the operation and its mitigations before flight; an LUC may provide privileges only within its scope.

C5 and C6 are product class markings—not pilot licences and not marketing descriptions. HI-DRONIC confirms a class only from the delivered unit’s physical label and EU declaration of conformity. A C5 unit is not automatically C6, and vice versa.

GO / NO-GO

HI-DRONIC mission gate

  1. 01Confirm operator registration and the competent authority
  2. 02Match the operation to STS, PDRA/SORA or an existing authorisation
  3. 03Verify the unit’s serial-number documents, class label and direct remote ID
  4. 04Check the national UAS map, airspace, temporary restrictions and site permissions
  5. 05Define the controlled ground area, buffers, access control and emergency response
  6. 06Use competent personnel; HI-DRONIC’s baseline is at least a remote pilot plus ground/payload operator or observer
  7. 07Confirm insurance, operations manual, maintenance status, flight log and incident procedure
  8. 08Record forecast and actual wind, visibility, precipitation, temperature and electrical risk
  9. 09Apply the strictest limit from the manufacturer manual, class declaration, operations manual and authorisation
  10. 10Brief the client and crew; stop the mission whenever conditions or the site change

AIR / GROUND

Which HI-DRONIC equipment needs aviation approval?

MAX1 / MAX2

UAS — yes

Registration, competency, airspace/geozone check and the appropriate specific-category route are required before a cleaning flight. C5/C6 status must be documented per delivered unit.

SOLARBOT

No UAS flight approval

It does not fly. Site-owner permission, roof/edge protection, electrical safety, panel-manufacturer instructions, water management and occupational safety still apply.

HI-BRUSH

No UAS flight approval

It is a ground-operated telescopic tool. Work-at-height prevention, exclusion zones, electrical/overhead hazards, water runoff, public protection and safe handling still apply.

WEATHER GATE

Weather is an operating limit, not a scheduling detail

The pre-flight decision covers current and forecast wind—including gusts and façade turbulence—visibility, precipitation, temperature, icing, lightning, solar heat, electromagnetic or GNSS conditions and hose behaviour. HI-DRONIC does not publish one universal wind value: the lowest applicable certified or authorised limit controls. The pilot-in-command may stop at any time.

FR · CZ · SK · PL · ES · DE

Country launch check

HI-DRONIC is established in the Czech Republic. For a cross-border specific-category operation, the home-state authorisation or declaration is only the starting point: complete the host-state procedure, check national geographical zones and obtain local coordination before mobilisation.

For every country: verify insurance rules, pilot evidence, STS declaration or host confirmation, airspace coordination, privacy, public-space permits, environmental discharge rules and occupational safety.

OFFICIAL SOURCES

Primary EU sources

EASA — specific category↗EU Regulation 2019/947↗EASA — standard scenarios↗EASA — cross-border operations↗